All events

Seminar: Meet EnBW - How to become a supplier for Offshore Wind!


-
Langholmveien 24, Egersund, Norway
Egersund Energy Hub

For member companies in NOWC and/or NORWEP

On the 28th of September @18.00 - 21.00, together with the large German Energy Company EnBW, Norseman Wind, Energy Innovation and DNB we are inviting NOWC and/or NORWEP member companies for an introduction of the possibilities to become a supplier for EnBW offshore wind farms already in operation, or more likely the ones EnBW has in the pipeline for development. Member companies will also be able to have a short pitch (8 minutes each). Pitches are full. Place: Egersund Energy Hub - Langholmveien 6, 4373 Egersund Only physical attendance - DEADLINE FOR REGISTRTION IS MONDAY 27TH AT 12.00h Programme: 18:00 - 18:15: Welcome by Mayor Eigersund Odd Stangeland, and introduction to Egersund Energy Hub. Frank Emil Moen Development Manager NOWC, Managing Director Energy Innovation 18:15 - 18:25: Introduction Norseman Wind. Planned development for a 1,4 GW bottom fixed offshore wind farm at Sørlige Nordsjø II - Harald Dirdal, Partner Norseman Wind 18:25 - 19:05: EnBW Energie - Portfolio Offshore Wind. Jakob Bollwinkel Manager Portfolio Development Offshore Wind Power Generation. Supply Chain description. Pre Qualification / Contract regimes: How to become a supplier for one of our offshore wind farms already in operation, or in the 3 - 4 GW EnBW has in the pipeline in Northern Europe? 19:05 - 19:15: Break 19:15 - 20:53: 8 min. Pitches from participating businesses / member companies (depends on how many companies are interested. If to many, we have to make a session without power point presentations, but with oral pitches with Q&A.
  • 19:15 - 19:23 XOCEAN NORWAY AS, Tomas Frafjord. Short presentation of XOCEAN and the services we are offering
  • 19:25 - 19:33 SHORELINE AS, Rebecca Rosseland. Company presentation of Shoreline Wind by Rebecca Rosseland. Moreover, a solution for simulating and modelling the design as well as the construction and O&M of the offshore wind farms. Along with the Execution solution for managing the construction and maintenance of offshore wind farms.
  • 19:35 - 19:43 KONGSTEIN AS, Andreas Strand. Kongstein - Offshore Wind interfaces
  • 19:45 - 19:53 MARINE TECHNOLOGIES LLC, Sveinung Tollefsen, Communication nodes in the wind farm as an alternative to LTE
  • 19:55 - 20:03 4SUBSEA AS. Harrison Alger. Structural Health Monitoring & Cable Monitoring Systems
  • 20:05 - 20:13 RELAYON NUTEC, Øyvind Kvammen. GWO Safety Training and our GWO/Wind WhitePaper
  • 20:15 - 20:23 MIROS, Emilie Dorgeville. Digital Sea State Data to Support Operations, Improve Efficiency and Reduce Risk and Costs
  • 20:25 - 20:33 BOUVET NORGE AS. Reidar Lorentzen. Digitalisation partner with solid experience from a range of the value chain of the overall energy sector (offshore wind, waterbased electricity grid, oil&gas. Planning, offshore wind operation, inspection, preventive maintenance, AR/VR, HSE etc.
  • 20:35 - 20:43 ONIX AS. Fanny Kongevold Fjemeros / Evy Kathrine Maffini. System for checking documentation for work equipment.
  • 20:45 - 20:53 The Crosby Group. Åge Bakken. Verton Windmaster Solution - https://thecrosbygroup.hs-sites.com/wind-verton.
20:53 - 21:30: Mingling / finger food Price: NOK 450,- p.p. (for covering the costs)

VENUE - Egersund Energy Hub:

Egersund Energy Hub  

Upcoming events